Indonesia staff managed the development of Raffles Cement’s new 25,000-tonne duo-cell
cement storage, blending and handling facility on a turnkey basis.
The scope of
works included management of engineering, authority approvals, commercial
coordination, procurement, construction, commissioning & completion. As a
result, outstanding quality and safety results were achieved across the
19-month project.
Our “hands on”
approach towards planning, design, procurement and construction was a key
element of the project’s success. In addition, the use of slipforming, precast
concrete, offshore modular fabrication and mechanized solutions shortened the
construction duration time considerably and achieved substantial cost savings
for the development of the project.
Key features
and achievements:
• Capital
Expenditure savings of 26% achieved over traditional contracting model.
• Placement
of 10,000 cubic metres of reinforced concrete.
• Construction
of 105m of RC silo walls in 30 days using slipform technique.
• Supervision
of design, procurement, installation, testing & commissioning of cement
handling equipment, instrumentation & controls from Ibau.
• Construction
of Electrical Substation, LV consumer room & MCC room.
• Construction
of Control Building, Office and external works.
• Utility
extensions (Telecom, Water, Sewer, Electrical).